The Agentic Command Center for Construction.Construction project management software for contractors and developers

Every project watched by agents that tell the right person. Cost, Scheduler, Finance and Procurement agents read your RAB, schedule, postings and purchase orders at the same time. When something slips, the person in charge hears about it on WhatsApp, Telegram or email.

Example project
Cost agentlive
Matching 114 postings to the RAB
Scheduler agentlive
Re-forecasting from this week's opname
Finance agentlive
Projecting cash 8 weeks ahead
Procurementearly accesslive
Checking quotes against last PO
Komander
Checks each finding against the source, grades it and picks who needs it

All four agents are reading the project file.

30live projects watched every day
7,500+cost postings processed, and counting
98%matched to a budget line automatically

Construction is about 10% of Indonesia's GDP and employs more than 8.7 million people, yet most projects are still run from spreadsheets that are read once a month.

The problems are already in your data. They are just read too late.

Cost

Overruns show up at the final opname, when the money is already spent.

Every posting matched to a RAB line, every week.

How it reads your sheets
Schedule

Delays are only felt at handover.

The forecast moves the day the opname comes in.

See a day of updates
Cash

Termin, supplier bills and retention are not projected, so cash runs short without warning.

Cash gaps flagged 30 to 90 days ahead.

See the forecast
People

Reports are rebuilt by hand, and read at the end of the month.

The person in charge gets the number on WhatsApp.

See an alert

Works from the sheets you already keep.

Connect Google Sheets, Excel or your accounting system once. Komander reads every tab, works out what each column means and keeps the dashboard current. When someone adds a row on site, the numbers and alerts update within minutes, and nobody rebuilds a report.

GSGoogle Sheets XLExcel ACAccurate JRJurnal by Mekari ODOdoo ERERP360 BKBank statements OPSite reports & opname
Komander reads it
Watching 4 tabs for changes.
Across our pilots: 7,500+ cost postings processed, 98% matched to a budget line.
Dashboard, Blok A1Updated 2 min ago
Recorded spendIDR 699.5M
Completion slip20d late
Company cash low point, next 60 days−Rp 100 jt, week of 30 Nov
Structure
75%
Roofing
95%
Tiling
42%

One day on one project, while you are on site.

Every dot is something an agent read. Only the few that matter become a message.

07:00
Waiting for the first update

The agents start reading as soon as the first sheet changes.

07:00
Senin, 6 Juli
No notifications
Waiting for tomorrow's 07:00 digest

    The S-curve and Gantt chart, current every week.

    The S-curve shows if the whole project is ahead or behind. The Gantt chart shows which task is causing it. Both are rebuilt from every opname.

    Kurva S

    Dashed is plan, solid is actual from opname

    Plan–
    Actual–
    Deviation–

    Gantt chart

    Outline is the plan, fill is work done, purple is the critical path

    Cost vs RAB

    Every material and labour line, budget against actual

    Cash-flow forecast

    Termin in, payables out, eight weeks ahead

    Opname history

    Each week's claimed progress, checked against the last

    See a cash gap weeks before the balance turns negative.

    The Finance agent reads receivables, payables, bank balances, retention and open POs for every project in the company, because cash is one pool. It projects 30, 60 and 90 days ahead and warns you while there is still time to act.

    Company cash forecast

    3 active projects, starting balance Rp 1,48 M on 19 Oct

    Money in: termin, retentionMoney out: suppliers, payrollProjected balanceMinimum cash Rp 250 jt
    Lowest balance in this window−Rp 100 jt

    Week of 30 Nov, 46 days from now

    Try what Finance would suggest
    Due in 30 days: in / outRp 1,12 M / 1,35 M
    Billable but not invoicedRp 282,5 jt
    Retention held by clientsRp 214 jt
    Open purchase ordersRp 486 jt

    Alerts you can act on in ten seconds.

    Every alert carries the number, where it came from, one owner and a next step. Try when one fires.

    TinggiCost agentBlok A1Today 08:02
    What happened

    Roofing is 13% over budget

    ActualIDR 117.4M
    BudgetIDR 104.0M
    GapIDR 13.4M
    Where the number came from
    Pengeluaran 2026, rows 412–418 (Google Sheets) against RAB rev. 9 Apr, line VI.2 Penutup atap
    Who owns it
    RPRina, Project manager. Owner copied because it is Tinggi.
    What to do next
    Two genteng POs exceed the RAB volume. Check them before the next delivery on 9 Jul.
    Mark checkedShow detailSnooze 3 days

    When does an alert fire?

    113%
    80%95% watch100%110%125%
    ActiveCondition met. The owner gets a message.
    ClearNormal. No message is sent.
    No dataKomander says so instead of staying silent.

      Before the project starts: Komander Build.

      Start from PDF, AutoCAD or SketchUp drawings, or from the RAB or BoQ you already have, and end with a live project the agents can watch.

        Komander BuildRumah Tinggal 2 Lt, Jakarta Selatan

        Won the tender? Nothing gets typed in twice.

        The moment you activate the project, Build hands its numbers to the agents that watch it.

        From BuildRAP Rp 918,4 jt
        Struktur Beton276,9 jtDinding & Plester129,8 jtListrik & Plumbing96,5 jt8 more divisions415,2 jt
        becomes
        Cost agentBudget per division and item

        11 divisions, 86 items ready to match spending

        From BuildJadwal & Kurva S 150 days, 11 work items with weights
        becomes
        Scheduler agentThe baseline progress is measured against

        Week 0 of 22. Progress is tracked from the first opname.

        From the contractTermin Rp 1,272 M
        Uang muka20%Termin 1, 2, 33 × 25%Retensi5%
        becomes
        Finance agentBilling plan inside the cash forecast

        5 termin dated from the progress triggers

        Send the reports you already make.

        Keep your own sheets. Here is what Komander does with a typical file from site, then try it with yours. The full guide is at komander.ai/panduan.

        What happens after you upload

          XLSpengeluaran_lapangan_minggu27.xlsx6 rows
          Now try it with your file

          Upload your report here

          Excel or CSV. The check runs in your browser and nothing is sent until you choose to.

          No sheet yet? Templates:

          Who is behind Komander.

          RM
          Ravi MelwaniCEO & Co-founder

          Leads product and pilots with developers and contractors in Indonesia.

          ExperienceOLX AutosOLX AutosEx-COOJasaconnectJasaconnectCEO
          AA
          Adel AlmasaabiCTO & Co-founder

          Builds the agents, data pipeline and alerting.

          ExperienceOrthosOrthosEx-CTOQoalaQoalaEx-Senior DevOps Engineer

          Join a pilot.

          Two ways to start. We reply on WhatsApp within two working days.

          Open now

          Core pilot

          Cost, Scheduler, Finance and Alerts for 5 weeks. Your first project is free.

          ProjectContract valueFee
          Value = contract value of each live project

          Apply for the Core pilot

          Where your data lives
          Application received.We will message you on WhatsApp within two working days to pick your projects. Send it on WhatsApp now
          Early access

          Komander Build

          Price your estimates. Your first project is free. Estimates use HSPK material prices for your city.

          Building typeTotal floor areaPrice
          Area = total floor area, not land area
          HouseRp 10.000 / m²Commercial & 3+ storeysRp 15.000 / m²MinimumRp 1 jt / estimateMonthly pack, 10 houses ≤ 200 m²Rp 12,5 jtAbove 2.000 m²Custom quote

          Join the Build waitlist

          You are on the waitlist.Your first project is free. We will message you on WhatsApp when your Build place opens. Send it on WhatsApp now
          Free live webinar, in Bahasa Indonesia

          See your next problem weeks before it costs you.

          Starting November 2026. Dates to be confirmed.

          Komander WebinarAgen AI untuk biaya, jadwal dan kas proyek konstruksiMulai November 2026, tanggal menyusul

          Masalah sudah ada di data, tapi terbaca terlambat

          MulaiOpname akhir13 minggu lebih awal
          Pengeluaran 2026Genteng metalSemen 50 kgBesi 10 mm
          Atap vs RAB113%Dikirim ke PM
          Kurva S, Gantt dan proyeksi kas 90 hari
          Prioritas TinggiAtap 13% di atas anggaran. Sumber: Pengeluaran baris 412–418.
          KasSaldo negatif dalam 46 hari.
          Alert yang langsung bisa ditindaklanjuti
          Struktur Beton312,8 jtDinding & Plester148,2 jtAtap74,3 jtTotal RAB1,27 M
          Komander Build: gambar ke RAB, RAP dan tender
          RMRavi MelwaniCEO & Co-founder
          AAdelCTO

          Tanya jawab langsung, dan cara ikut pilot gratis

          00:00 Preview

          Save your seat

          Register now and we will send you the date and Zoom link by email and WhatsApp as soon as it is confirmed.

          You're on the list.We'll message you as soon as the date is confirmed. Add to calendar (.ics)Google CalendarConfirm on WhatsApp

          Learn to build reports the agents can read.

          Free step-by-step guides and templates from Komander Panduan, in Bahasa Indonesia. Each one shows every screen.

          See all guides
          For Quantity Surveyors

          Bring your projects to Komander and earn.

          A pilot commission and 15–20% of every subscription for 12 months, 20% of every Build estimate, and Rp 100.000 for each blueprint from your past projects.

          Join the QS Partner Network

          About Komander.ai

          Komander.ai is AI construction project management software for contractors, housing developers and project owners in Indonesia. It reads the data you already keep, such as the RAB (budget), schedule, cost postings, purchase orders and progress billing in Google Sheets, Excel or exports from Accurate, Jurnal and Odoo, without changing how your site team works.

          Four agents work at the same time. The Cost agent compares budget with actual cost per work package. The Schedule agent tracks the S-curve and Gantt chart. The Finance agent forecasts project cash flow, receivables and supplier payables. The Procurement agent watches purchase orders and materials. When something slips, the person responsible is told on WhatsApp, Telegram or email.

          Komander Build turns drawings into a RAB, bill of quantities and tender documents, then activates the project once the tender is won. Komander is built by PT Komander Inovasi Teknologi in Jakarta.

          Questions owners ask us.

          Does the site team have to work differently?

          No. Komander reads the sheets and system exports you already produce. The only request is a project or block tag on each row, so projects can be told apart.

          Which systems can you read?

          Google Sheets and Excel, plus direct exports from Accurate, Jurnal (Mekari), Odoo and ERP360, bank statements, and site reports or opname. Teams without a system can start from our Indonesian Excel template.

          Who can see our data?

          Your data stays yours. During a pilot, access is limited to the pilot team on both sides, and nothing is shared between companies.

          What if our data is incomplete?

          You get a data quality report in the first week. When a sheet is missing or late, the alert shows "No data" and says what is missing instead of staying quiet.

          Can alerts come in Bahasa Indonesia?

          Yes. Each person chooses Bahasa Indonesia or English, and WhatsApp, Telegram or email.

          What does it cost after the pilot?

          Core (Cost, Scheduler and Alerts) is billed per project per month: Rp 1 jt for projects under Rp 2 billion, Rp 3 jt for Rp 2–10 billion, Rp 6 jt for Rp 10–25 billion. The Finance agent is per company: Rp 3 jt a month for up to 5 active projects, Rp 5 jt for 6–15. Build is Rp 10.000 per m² for houses and Rp 15.000 per m² for commercial and 3+ storey buildings (minimum Rp 1 jt per estimate), or Rp 12,5 jt a month for 10 houses up to 200 m². Your first Build project is free. Pay yearly and get 12 months for the price of 10.