Government tenders are open to every contractor whose licences match the package, and packages with a budget up to Rp15 billion are reserved for small businesses. What stops many contractors before they start is preparation: an SBU code that does not match, an invalid tax status, or an account that is not ready when the right package appears.
What to prepare
| Document or account | What for | Note |
|---|---|---|
| Company tax number (NPWP) and deed | Company identity | Data must match across every system |
| Business ID (NIB) through OSS with construction KBLI codes | Business licence | KBLI must line up with the SBU subclassification |
| Business certificate (SBU) | Required for every construction business (UU 2/2017 article 30) | Subclassification and qualification must match the package |
| Staff competence certificates (SKK) | Required for managerial and responsible staff | Staff without SKK are not counted |
| Valid tax status confirmation (KSWP) | Proof of tax compliance | Checked in the tender documents |
| INAPROC account | Access to the national procurement services | Face and ID card check, one ID number per account |
The construction licensing rule is now Permen PU 6/2025 (replacing Permen PUPR 6/2021). The order above is the most logical one, because the SBU needs the NIB and staff SKK; no single rule sets the order.
INAPROC and SIKaP accounts
Since an LKPP deputy’s letter of 17 November 2025, suppliers are asked to create an INAPROC account at akun.inaproc.id: personal email, a phone OTP code, a company profile with NIB, NPWP and VAT registration letter, then face verification and an ID card photo for the electronic certificate. One ID number is allowed one account. Until the old SPSE is shut down, the old SPSE and SIKaP logins still work. Verified supplier data can be used at every LPSE. Ask your nearest LPSE whether it still checks original documents.
The thresholds that set your chances
| Value | Rule | Basis |
|---|---|---|
| Up to Rp400 million | Construction may be bought by direct procurement (pengadaan langsung) | Perpres 46/2025 article 1 |
| Budget up to Rp15 billion | Reserved for micro and small businesses and cooperatives, unless the work needs technical ability small firms lack | Perpres 46/2025 article 65(3) |
| Owner’s estimate (HPS) above Rp10 billion | Bid security of 1 to 3% of HPS required | Perpres 46/2025 article 30 |
| Contract above Rp200 million | Performance security of 5% of contract value (5% of HPS if the bid is below 80% of HPS) | Perpres 46/2025 article 33 |
Since 1 September 2026, LKPP Regulation 2/2026 has also opened the electronic catalogue to construction work, with priority for local businesses, so some work is bought by e-purchasing rather than by tender.
Example: a first package in Bekasi, West Java
| Item | Amount | What it means |
|---|---|---|
| Budget for an office building refurbishment | Rp1.8 bn | Under Rp15 bn: reserved for small businesses |
| Owner’s estimate (HPS) | Rp1.75 bn | Under Rp10 bn: no bid security |
| Bid after correction | Rp1.6 bn (91% of HPS) | Above 80% of HPS: no price reasonableness check |
| Performance security if you win | Rp80 m (5% of Rp1.6 bn) | Arrange a bank guarantee facility before bidding |
Finding and following a package
- Watch this year’s procurement plans in SIRUP for agencies in your area.
- Check tender announcements on the agency’s LPSE (spse.inaproc.id/agency-name) and match the SBU subclassification, qualification and location.
- Download the tender documents and read the LDP and LDK before deciding to bid.
- Follow the clarification meeting (aanwijzing) in SPSE and download every addendum.
- Upload the bid before the deadline; do not wait for the last hour.
- Watch the evaluation result. To object, file a sanggah within 5 calendar days of the award announcement (ending on a working day and hour); the exact dates are in the SPSE schedule.
Rules in force in November 2026: Perpres 16/2018 as last amended by Perpres 46/2025, and LKPP Regulation 3/2026 (September 2026), which replaced LKPP Regulation 12/2021. The rules are still in transition (LKPP Circular 3/2026), so what binds each package is that package’s tender documents (LDP and LDK) and the schedule in SPSE. Since 1 November 2026 bidders’ beneficial ownership data is also evaluated.
Common mistakes
- An SBU subclassification different from the one the LDP asks for, even with a higher qualification.
- KBLI codes in the NIB that do not line up with the SBU.
- An expired SBU or an invalid KSWP at the bid deadline.
- Creating the account in a rush after the package is announced.
- Using deadlines from an old guide instead of the SPSE schedule.
The full guide is in How to build a construction cost report that catches overruns early. It has a free template (Excel or Google Sheets) and a checker that reads your own workbook.
Ready to use the Komander agents on your projects?
When your workbook is complete, apply for a pilot: we help connect your project data to the Finance, Cost and Scheduler agents and review the first reports with you.
Send to melwani@komander.ai. Your workbook check result is included when there is one; the workbook itself is not sent.
Common questions
What do I need to bid for government construction work?
An NIB with construction KBLI codes, an SBU whose subclassification and qualification match the package, staff with SKK, a valid tax status (KSWP) and a procurement account (INAPROC, or SPSE/SIKaP during the transition).
Which packages are reserved for small contractors?
Packages with a budget up to Rp15 billion are reserved for micro and small businesses and cooperatives (Perpres 46/2025 article 65(3)), unless the work needs technical ability small firms lack.
What is the direct procurement limit for construction?
Up to Rp400 million under Perpres 46/2025.
References
- LKPP legal database: consolidated Perpres 16/2018 to 46/2025 (Indonesian): thresholds and guarantees
- LKPP letter of 17 November 2025 on INAPROC supplier accounts (Indonesian): INAPROC accounts