KomanderGuides
1 · PreconstructionCost control / PRACTICAL GUIDE

Site Survey Before a Construction Project: A Checklist That Prevents Cost Surprises

A site survey checklist before tendering or starting a project: access, ground and water, boundaries, utilities, neighbouring buildings, storage space, local rules and local prices. The result feeds the RAP and schedule.

Komander.ai Panduan team · 2 min read · Updated 9 October 2026

Many cost overruns can be seen before the project starts: an access road too narrow for trucks, soft ground, a high water table, or a neighbour’s house that is already cracked. A tidy site survey turns those surprises into lines in the RAP and the schedule.

Access and roadsGround and waterBoundaries and pegsUtilitiesNeighbours and permitsSurvey report
The order of a site survey; the result is a survey report that feeds the RAP and schedule.

Survey checklist

What to checkQuestionEffect on cost or time
AccessCan material trucks and mixers get in? When may they unload?Extra transport, manual handling
GroundSoft, rocky or fill? Is a soil test needed?Deeper foundations, ground improvement
Groundwater and floodingHow deep is the water table? Has it flooded?Pumping (dewatering), higher fill
BoundariesDo the pegs match the drawings and title?Adjust the drawings before starting
UtilitiesIs there site power and water? Drainage?Generator, well, water tank
Neighbouring buildingsThe state of neighbours’ walls and floors before workDated photos prevent damage claims
Working spaceWhere will the store, site office, rebar yard and materials go?Renting extra land
NeighbourhoodLocal permissions, working hours, noise rulesEffective working days
Local pricesMaterial prices and crew wages near the siteBase prices in the AHSP and RAP

The survey report

Common mistakes

Start from a template

The full guide is in How to build a construction cost report that catches overruns early. It has a free template (Excel or Google Sheets) and a checker that reads your own workbook.

Get the templateCheck my workbook

Ready to use the Komander agents on your projects?

When your workbook is complete, apply for a pilot: we help connect your project data to the Finance, Cost and Scheduler agents and review the first reports with you.

Send with GmailEmail app

Send to melwani@komander.ai. Your workbook check result is included when there is one; the workbook itself is not sent.

Common questions

What is checked in a site survey?

Access, ground and water, boundaries, utilities, neighbouring buildings, working space, local rules and local prices.

When should the site survey happen?

Before pricing the tender, and again before mobilisation.

Why photograph neighbouring buildings?

Dated photos of their starting state protect the contractor from claims for damage that existed before the project.