1 · PreconstructionScheduling / PRACTICAL GUIDE

Method Statement for Tenders: Contents, an Example, and How to Pass Technical Evaluation

How to write a construction method statement for a bid: the sequence of the main work items, plant and labour, schedule, quality and safety, and consistency with the budget, schedule and safety plan that evaluators check.

Komander.ai Panduan team · 2 min read · Updated 9 October 2026

The method statement explains how the work will be done: the sequence, the plant and labour, and how quality and safety are kept. In a tender, evaluators read it to judge whether the bidder really understands the work, especially the main work items named in the tender documents. A method copied from another project is easy to spot and often gets a bid rejected.

Study drawingsWork sequencePlant and labourScheduleQuality and safetyInto the bid
Building a method statement from drawings to bid.

What it contains

PartContentsExample for housing block C5
OverviewLocation, access, site conditions, block orderStart from the back blocks so the entrance road is not damaged
PreliminariesSite office, store, temporary water and power, setting outProfiles and level pegs to the flood level
Main work itemsSteps per item, plant, labour, testingFoundations, ground beams, columns, walls, roof per house
Plant and labourType, number, when mobilised2 mixers, 2 vibrators, 4 gangs
ScheduleLink to the S-curve and gantt chart32 weeks, 4 houses at a time
QualityHold points and testsCheck rebar before pouring, slump test every truck
SafetyMain hazards and controls, refer to the RKKGuarded scaffolds, harnesses for roof work

What evaluators check

On government tenders, the main work items and how method statements are evaluated are set by the tender documents and circulars of the Ministry of Public Works. Always follow the tender documents for the package.

Common mistakes

Start from a template

The full guide is in How to create a weekly construction schedule report in Google Sheets. It has a free template (Excel or Google Sheets) and a checker that reads your own workbook.

Get the templateCheck my workbook

Ready to use the Komander agents on your projects?

When your workbook is complete, apply for a pilot: we help connect your project data to the Finance, Cost and Scheduler agents and review the first reports with you.

Send with GmailEmail app

Send to melwani@komander.ai. Your workbook check result is included when there is one; the workbook itself is not sent.

Common questions

What goes in a method statement?

An overview, preliminaries, the steps for the main work items, plant and labour, schedule, quality and safety.

Why can a method statement get a bid rejected?

If main work items are not explained, the sequence makes no sense, or it does not match the budget, schedule and RKK.

Is it used after winning?

Yes. It becomes the basis of the site work plan and the pre-construction meeting.