KomanderGuides
1 · PreconstructionProject documents / PRACTICAL GUIDE

How to Win Construction Tenders Legitimately: Choosing Packages, Defensible Prices, and the Practices to Avoid

How to win Indonesian government construction tenders within the rules: choosing packages with SIRUP and Opentender data, pricing from AHSP, the price check below 80% of the owner’s estimate, the technical bid, learning from evaluation results, and the risk of bid rigging under UU 5/1999 with examples of KPPU decisions.

Komander.ai Panduan team · 4 min read · Updated 9 October 2026

Edited by Ravi MelwaniCEO & Co-founder, Komander.ai

Prices and rules are summarised from the sources listed below and updated regularly. Check local prices and the relevant authority before relying on them.

Your chances rise when you choose the right packages, bid a price you can defend, and avoid rejection on documents. There is no safe shortcut: the evidence the competition commission (KPPU) uses is simple, such as the same IP address and the same typing errors in several bidders’ documents.

25%20%20%15%20%
  • SBU and qualification match
  • Cash and guarantee line
  • Location, plant and staff ready
  • Remaining package capacity
  • Competitor and price history
An example in-house go/no-go weighting (not a rule) · bid if the total is at least 70 with no zero score.

Choose packages with data

A price you can defend

Build the price from unit price analysis (AHSP under Permen PUPR 8/2023) with your own prices and productivity, not just a cut from HPS. A bid below 80% of HPS after arithmetic correction gets a reasonableness check; if it is unreasonable or the bidder skips the clarification, it is rejected (LKPP Circular 4/2022). If reasonable, its performance security becomes 5% of HPS.

Example: pricing an Rp2 bn package

ItemAmountNote
Owner’s estimate (HPS)Rp2 bnBuilding package in Bekasi, West Java
Direct cost from your own AHSPRp1.55 bnMaterial and labour prices from supplier and foreman quotes
Head office overhead and profitRp230 mFrom the company overhead rate
Bid priceRp1.78 bn (89% of HPS)Above 80% of HPS; every unit rate can be explained
If cut to Rp1.55 bn (77.5% of HPS)Price reasonableness checkNo profit or overhead: risk of rejection or a loss

The technical bid and avoiding rejection

After the tender

  1. Read the evaluation result and rejection reasons in SPSE.
  2. Object (sanggah) only when you have a reason that points to the tender documents, within 5 calendar days of the award announcement.
  3. Record the winning price and number of bidders for the next package.
  4. Protect contract performance: blacklisting is set out in LKPP Regulation 4/2021 and can only be cancelled by a final court decision. Supplier performance ratings will be used in qualification once the system feature is live.

Practices to avoid

PracticeRuleConsequence
Collusion between bidders or with the committeeUU 5/1999 article 22KPPU fine of at least Rp1 bn, up to 50% of net profit or 10% of sales in the relevant market
Borrowed-name bidding (pinjam bendera)LKPP Regulation 3/2026Rejection, termination, blacklisting
Bribery and gratuitiesAnti-corruption lawCriminal; about 25% of KPK cases (446 of 1,782 to the end of 2025) relate to procurement

Example decisions: in the Sintong bridge tender case in Rokan Hilir (No. 17/KPPU-L/2024, budget about Rp54 bn), one firm was fined Rp1 bn and three accompanying firms were barred from APBN and APBD construction tenders in Riau for 2 years. In the Bogor Regency hospital building case (decided 26 January 2026), two firms were fined Rp2 bn and Rp1 bn. Evidence KPPU used in such cases includes the same IP address, near-identical documents and identical typing errors.

Common mistakes

Start from a template

The full guide is in How to build a construction cost report that catches overruns early. It has a free template (Excel or Google Sheets) and a checker that reads your own workbook.

Get the templateCheck my workbook

Ready to use the Komander agents on your projects?

When your workbook is complete, apply for a pilot: we help connect your project data to the Finance, Cost and Scheduler agents and review the first reports with you.

Send with GmailEmail app

Send to melwani@komander.ai. Your workbook check result is included when there is one; the workbook itself is not sent.

Common questions

How do you win a government construction tender?

Pick packages that fit your SBU and capacity, build the price from your own AHSP, make sure qualification documents are complete, and write a method statement specific to the site.

What happens to a bid below 80% of HPS?

The Pokja checks whether the price is reasonable. If not, or if the bidder skips the clarification, the bid is rejected; if so, the performance security becomes 5% of HPS.

What is the fine for bid rigging?

Under KPPU rules, at least Rp1 bn and at most 50% of net profit or 10% of sales in the relevant market.

References

  1. Open Contracting Partnership: Opentender Indonesia: 1.8 million tenders
  2. KPPU Regulation 2/2021 (Indonesian): fines