Controlling Heavy Equipment and Plant Hire on Site: Working Hours, Fuel and Idle Time

How to record and control hired heavy equipment on a construction project: daily timesheets, waiting and breakdown hours, fuel, productivity, what the hire contract must say, and comparing plant cost with the RAP.

Komander.ai Panduan team · 2 min read · Updated 9 October 2026

Edited by Ravi MelwaniCEO & Co-founder, Komander.ai

Prices and rules are summarised from the sources listed below and updated regularly. Check local prices and the relevant authority before relying on them.

Hired plant is paid by the hour or day, whether it works or waits. Cost usually leaks not through the rate but through paid hours with no output: waiting for trucks, waiting for an operator, breakdowns, or no work ready. A daily record of plant hours shows where the leak is.

61%18%14%
  • Working 34 h
  • Waiting for trucks 10 h
  • Breakdown 4 h
  • No work 8 h
One week of a rented excavator: 56 hours paid · only 61% of paid hours were actually working.

Daily plant timesheet

ColumnExample
Plant and unit number0.8 m3 excavator, unit EX-02
Hour meter start and end1,204 and 1,212 = 8 hours
Working hours5 hours drain excavation at block M8
Waiting hours and why2 hours waiting for dump trucks
Breakdown hours1 hour hydraulic hose
Fuel added60 litres
Output160 m3 excavated
InitialsOperator and site supervisor

The numbers to watch

What the hire contract must make clear

Hire rates vary by region, machine size and hire period, and quoted rates often exclude mobilisation, operator or fuel. Get quotes from several local providers and compare them on the same scope.

Common mistakes

Start from a template

The full guide is in How to build a construction cost report that catches overruns early. It has a free template (Excel or Google Sheets) and a checker that reads your own workbook.

Get the templateCheck my workbook

Ready to use the Komander agents on your projects?

When your workbook is complete, apply for a pilot: we help connect your project data to the Finance, Cost and Scheduler agents and review the first reports with you.

Send with GmailEmail app

Send to melwani@komander.ai. Your workbook check result is included when there is one; the workbook itself is not sent.

Common questions

How is plant utilisation worked out?

Working hours divided by paid hours. Low utilisation means many waiting or breakdown hours.

What goes on a plant timesheet?

Hour meter start and end, working hours, waiting hours and why, breakdown hours, fuel, output, and the operator’s and supervisor’s initials.

What must the hire contract make clear?

Rates and minimum hours, who pays for operator, fuel, maintenance and mobilisation, and the rule for breakdown hours.