Project Handover: PHO, FHO, As-Built Drawings and the Final Report
A project is not done until handover, retention is released and the lessons are written down. These articles help you close a project cleanly.
3 · Post-constructionCost controlProject Handover (PHO and FHO): Checklist, Maintenance Period and Closing the Project Books3 · Post-constructionProject documentsAs-Built Drawings: Contents, Building Them During the Project, and Handover3 · Post-constructionCost controlFinal Project Report: Comparing Plan with Actual, and Lessons for the Next Tender